Jump to content
Toggle menu
Toggle preferences menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.
< SOP
Revision as of 00:40, 21 October 2026 by Limerence (talk | contribs) (Created page with "Chief Engineer Station Engineer Atmospheric Technician Technical_Assistant == Power Generation == # Non-atmospheric engineering personnel must set up the AME and/or attach the solar network before moving to other power sources. Failure to do so will be considered grounds for immediate dismissal.<br><br> # The tesla ba...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Chief Engineer

Station Engineer

Atmospheric Technician

Technical_Assistant

Power Generation

  1. Non-atmospheric engineering personnel must set up the AME and/or attach the solar network before moving to other power sources. Failure to do so will be considered grounds for immediate dismissal.

  2. The tesla ball, singularity and supermatter crystal may not be started without explicit permission from the Chief Engineer.

  3. The supermatter crystal's chamber must incorporate an emergency venting system to reduce the pressure in the chamber to 0 kpa in the event of a potential delamination.

  4. Atmospheric personnel may start the TEG and/or supermatter crystal after both the distribution and waste air lines are completed.

Station Damage

  1. Damage to the bridge, evac, arrivals and secure areas should be prioritized for repairs. Following these areas is the medical and the security departments.

  2. Should repairs be required with no appropriate personnel around, engineering personnel may hack doors to repair the area. These doors must be returned to their original condition once repairs are complete.

  3. Should no station damage be present, Engineers may take on solo projects, reconstructions or shuttle building.

  4. Security should be contacted to establish a perimeter around especially damaged areas of the station.